Okatie-Bluffton 115kV: Rebuild
Dominion Energy SCFiled in-service: 6/1/2025 · precision: day
Source: DESC Planned Transmission Projects $2M and Above Total - 2025-2029 · page 8
Open source document ↗Ten years of NOAA station records replayed for any U.S. location, with last year’s weather, the NWS forecast, wetland and soil context, and a PDF you can hand to the team.
Historical replay · user-entered costsSearch a town or address, or click anywhere on the map, then press Report this spot. Weather, flood, wetland and soil records are looked up from public sources on our server.
Pick a site first: search above, click the map, or choose a project.
Each start month is replayed against every year of recorded daily weather at the nearest NOAA station (the last 10 years). A day is lost when it crosses a stop rule below; the task finishes when it has banked its workable days. No forecast, no probability model: this is what actually would have happened.
Pick a point on the map. Weather history is available within 30 mi of an analyzed NOAA station with a complete 2016–2025 record.
Pick a site to see its flood zone, wetland, gauges, tides and soil.
work days × paid hours/day × (crew + equipment rate) × site multiplier + permit cost + closed days × standby cost
Crews are paid for the shift but only work while the window is open. A tighter tide, daylight or flood-stage window adds paid days. Every input starts blank; blank means unknown.
Modeled cost, not a bid. Map screening (FEMA, NWI, SSURGO) is not a wetland delineation, permit determination or geotechnical finding. The multiplier and rates are yours.
Split one shared item pro rata, for example by mat-days or crossings each utility uses. Optionally enter what each would pay to build alone to see the modeled difference. Pair: Okatie-Bluffton 115kV: Rebuild / SAV: GOSHEN (SAV) - KRAFT 115KV LINE REBUILD.
3 required inputs remaining.
Possible shared activity, not savings. Each utility still files its own permits; a joint pre-application meeting is a question to raise, not an assumption.
Adds both project centers as one-click sites on the map and keeps their filing evidence with the report.
Changing the pair opens a fresh worksheet. Up to 100 pairs from the active dataset are listed.
Filed in-service: 6/1/2025 · precision: day
Source: DESC Planned Transmission Projects $2M and Above Total - 2025-2029 · page 8
Open source document ↗Filed in-service: 6/1/2027 · precision: day
Source: 2025 IRP Technical Appendix Volume 3 - Transmission Plan - Public Disclosure · page 183
This pair was rejected in review. Its costs can be explored hypothetically, but it is not a validated coordination opportunity. Center distance is not a truck route. Filed in-service dates are not construction windows.
Inspect pair evidence and review details →