Okatie-Bluffton 115kV: Rebuild
Dominion Energy SC
DESC:6808 S- Source
- DESC filing 2025-2029, p. 8
- Native ID
- 6808 S
- Owner code
- Not published
- In service
- 6/1/2025 (exact date 2025-06-01)
- Status
- In Progress
Endpoint locations
- Blufftonmedium confidence32.23503, -80.85338 · OpenStreetMap way/498967268Medium by location-review-v2: exact normalized-name match to way/498967268; state evidence home_state_only; operator evidence match; voltage evidence match; coordinate method overpass_bbox_center; limitations project_area_unverified.
1 rejected or unlocated candidate
- Okatie Unlocated by location-review-v2: no_named_osm_candidate.
Center: 32.23503, -80.85338, from one located endpoint
Values as filed
| Project name | Okatie-Bluffton 115kV: Rebuild DESC filing 2025-2029, p. 8Okatie-Bluffton 115kV: Rebuild |
|---|---|
| Project ID | 6808 S |
| Description | Replace wooden H-Frame structures with Self Supporting Steel Structures and upgrade conductor to standard 1272 ACSR. DESC filing 2025-2029, p. 8Replace wooden H-Frame structures with Self Supporting Steel Structures and upgrade conductor to standard 1272 ACSR. |
| Need | This project is required to address end of life and reliability issues on these lines. DESC filing 2025-2029, p. 8This project is required to address end of life and reliability issues on these lines. |
| Status | In Progress DESC filing 2025-2029, p. 8In Progress |
| In-service date | 6/1/2025 DESC filing 2025-2029, p. 86/1/2025 |
| Estimated cost (as filed) | $40,674,739 DESC filing 2025-2029, p. 8Previous 2025 2026 2027 2028 2029 Total* $28,774,739 $11,900,000 $0 $0 $0 $0 $40,674,739 |
| Voltage | 115 kV DESC filing 2025-2029, p. 8Okatie-Bluffton 115kV: Rebuild |
| Endpoints (as filed) | Okatie · Bluffton DESC filing 2025-2029, p. 8Okatie-Bluffton 115kV: Rebuild |
Filing changes
cost_usd: 40,660,000 → 40,674,739
Raw source text
Project 8 of 47 Dominion Energy South Carolina Planned Transmission Projects $2M and above Total 5 Year Budget Okatie-Bluffton 115kV: Rebuild Project ID 6808 S Project Description Replace wooden H-Frame structures with Self Supporting Steel Structures and upgrade conductor to standard 1272 ACSR. Project Need This project is required to address end of life and reliability issues on these lines. Project Status In Progress Planned In-Service Date 6/1/2025 Estimated Project Cost Previous 2025 2026 2027 2028 2029 Total* $28,774,739 $11,900,000 $0 $0 $0 $0 $40,674,739 *Total Estimated Amount applied to 2025 Rate Base Calculation