Dominion Energy SCOkatie-Bluffton 115kV: Rebuild
Filed owner code SAV · Georgia filingSAV: GOSHEN (SAV) - KRAFT 115KV LINE REBUILD
18.13 miin service 730 days apart10–25 miRejected in reviewhistoricalrank 2

Pair DESC:6808 S__GPC:20785. A rejected pair retained for audit. It is not a validated coordination opportunity.

Coordination card

Impact inputs →

Deterministic facts

Gemini brief

Brief unavailable: no validated Gemini brief could be loaded for this pair. The deterministic evidence remains available.

Evidence

A

Okatie-Bluffton 115kV: Rebuild

Dominion Energy SCDESC:6808 S
Source
DESC filing 2025-2029, p. 8
Native ID
6808 S
Owner code
Not published
In service
6/1/2025 (exact date 2025-06-01)
Status
In Progress

Endpoint locations

  • Blufftonmedium confidence
    32.23503, -80.85338 · OpenStreetMap way/498967268
    Medium by location-review-v2: exact normalized-name match to way/498967268; state evidence home_state_only; operator evidence match; voltage evidence match; coordinate method overpass_bbox_center; limitations project_area_unverified.
1 rejected or unlocated candidate
  • Okatie Unlocated by location-review-v2: no_named_osm_candidate.

Center: 32.23503, -80.85338, from one located endpoint

Values as filed

Project name
Okatie-Bluffton 115kV: Rebuild
DESC filing 2025-2029, p. 8Okatie-Bluffton 115kV: Rebuild
Project ID
6808 S
DESC filing 2025-2029, p. 86808 S
Description
Replace wooden H-Frame structures with Self Supporting Steel Structures and upgrade conductor to standard 1272 ACSR.
DESC filing 2025-2029, p. 8Replace wooden H-Frame structures with Self Supporting Steel Structures and upgrade conductor to standard 1272 ACSR.
Need
This project is required to address end of life and reliability issues on these lines.
DESC filing 2025-2029, p. 8This project is required to address end of life and reliability issues on these lines.
Status
In Progress
DESC filing 2025-2029, p. 8In Progress
In-service date
6/1/2025
DESC filing 2025-2029, p. 86/1/2025
Estimated cost (as filed)
$40,674,739
DESC filing 2025-2029, p. 8Previous 2025 2026 2027 2028 2029 Total* $28,774,739 $11,900,000 $0 $0 $0 $0 $40,674,739
Voltage
115 kV
DESC filing 2025-2029, p. 8Okatie-Bluffton 115kV: Rebuild
Endpoints (as filed)
Okatie · Bluffton
DESC filing 2025-2029, p. 8Okatie-Bluffton 115kV: Rebuild

Filing changes

Raw source text
Project 8 of 47
Dominion Energy South Carolina
Planned Transmission Projects $2M and above Total
5 Year Budget
Okatie-Bluffton 115kV: Rebuild
Project ID
6808 S
Project Description
Replace wooden H-Frame structures with Self Supporting Steel Structures and upgrade conductor to
standard 1272 ACSR.
Project Need
This project is required to address end of life and reliability issues on these lines.
Project Status
In Progress
Planned In-Service Date
6/1/2025
Estimated Project Cost
Previous 2025 2026 2027 2028 2029 Total*
$28,774,739 $11,900,000 $0 $0 $0 $0 $40,674,739
*Total Estimated Amount applied to 2025 Rate Base Calculation
B

SAV: GOSHEN (SAV) - KRAFT 115KV LINE REBUILD

Filed owner code SAV · Georgia filingGPC:20785
Source
GPC filing 2025 IRP, p. 183 (page number only; decision D2)
Native ID
20785
Owner code
SAV · utility from owner:SAV
In service
6/1/2027 (exact date 2027-06-01)

Endpoint locations

  • KRAFTmedium confidence
    32.14814, -81.14598 · OpenStreetMap way/121986375
    Medium by location-review-v2: exact normalized-name match to way/121986375; state evidence home_state_only; operator evidence match; voltage evidence match; coordinate method overpass_bbox_center; limitations project_area_unverified.
1 rejected or unlocated candidate
  • GOSHEN Unlocated by location-review-v2: multiple_contextually_viable_candidates.

Center: 32.14814, -81.14598, from one located endpoint

Values as filed

Project name
SAV: GOSHEN (SAV) - KRAFT 115KV LINE REBUILD
GPC filing 2025 IRP, p. 183SAV: GOSHEN (SAV) - KRAFT 115KV LINE REBUILD
Project ID
20785
GPC filing 2025 IRP, p. 18320785
In-service date
6/1/2027
GPC filing 2025 IRP, p. 1836/1/2027

Filing changes

No changes recorded between filings.