Field operations · evidence desk

Plan one mobilization

Check a confirmed worksite, current conditions, a truck-specific route, and actual-outcome evidence without blending their limits.

01Enter facts02Check sources03Review limits
Verified directoryChecking…
Current conditionsChecking…
Truck routeChecking…
Duration modelChecking…
01

Confirm the worksite

Click the map or enter coordinates. Common Ground does not verify the point; provider evidence stays source-bound.

Loading basemap…

Click the map to set latitude and longitude. Checking the worksite still requires a label and AEF year, then calls `/api/operations/site`.

02Reference utility and county evidenceOptional · does not set the worksite

EIA distribution-equipment counties are reference context, not a transmission project location or exclusive service territory.

Use the National explorer for named state and county filters.

03Truck routeOptional · explicit vehicle facts required

Destination: check a worksite first. No route is drawn on the project map.

Trailer declaration
Hazardous goods
04Construction duration evidenceOptional · authorized actual histories only
unavailable

Checking model availability…

Evidence board

No active worksite

+

Start with a confirmed point

The board keeps weather, road work, annual context, soil, routing, and duration evidence separate.