Hooks - Modoc 115/46 kV Rebuild
Dominion Energy SC
DESC:6809 G- Source
- DESC filing 2025-2029, p. 11
- Native ID
- 6809 G
- Owner code
- Not published
- In service
- 12/31/27 (exact date 2027-12-31)
- Status
- In Progress
Endpoint locations
- Modocmedium confidence33.73629, -82.20150 · OpenStreetMap way/1074904620Medium by location-review-v2: exact normalized-name match to way/1074904620; state evidence home_state_only; operator evidence missing; voltage evidence match; coordinate method overpass_bbox_center; limitations project_area_unverified, operator_missing.
1 rejected or unlocated candidate
- Hooks Unlocated by location-review-v2: no_named_osm_candidate.
Center: 33.73629, -82.20150, from one located endpoint
Values as filed
| Project name | Hooks - Modoc 115/46 kV Rebuild DESC filing 2025-2029, p. 11Hooks - Modoc 115/46 kV Rebuild |
|---|---|
| Project ID | 6809 G |
| Description | Upgrade 6.5 miles of aging conductor with 1272 ACSR and rebuild with SPDC. DESC filing 2025-2029, p. 11Upgrade 6.5 miles of aging conductor with 1272 ACSR and rebuild with SPDC. |
| Need | This project is required to address end of life and reliability issues on these lines. DESC filing 2025-2029, p. 11This project is required to address end of life and reliability issues on these lines. |
| Status | In Progress DESC filing 2025-2029, p. 11In Progress |
| In-service date | 12/31/27 DESC filing 2025-2029, p. 1112/31/27 |
| Estimated cost (as filed) | $7,800,000 DESC filing 2025-2029, p. 11Previous 2025 2026 2027 2028 2029 Total $150,000 $0 $100,000 $7,550,000 $0 $0 $7,800,000 |
| Voltage | 115 kV, 46 kV DESC filing 2025-2029, p. 11Hooks - Modoc 115/46 kV Rebuild |
| Endpoints (as filed) | Hooks · Modoc DESC filing 2025-2029, p. 11Hooks - Modoc 115/46 kV Rebuild |
Filing changes
in_service.date: 2025-12-31 → 2027-12-31name: Stevens Creek - Hooks 115kV/LR Plumb Branch 46kV → Hooks - Modoc 115/46 kV Rebuildstatus: Planned → In Progress
Raw source text
Project 11 of 47 Dominion Energy South Carolina Planned Transmission Projects $2M and above Total 5 Year Budget Hooks - Modoc 115/46 kV Rebuild Project ID 6809 G Project Description Upgrade 6.5 miles of aging conductor with 1272 ACSR and rebuild with SPDC. Project Need This project is required to address end of life and reliability issues on these lines. Project Status In Progress Planned In-Service Date 12/31/27 Estimated Project Cost Previous 2025 2026 2027 2028 2029 Total $150,000 $0 $100,000 $7,550,000 $0 $0 $7,800,000 *Total Estimated Amount applied to the 2027 Rate Base Calculation