Dominion Energy SCJasper – Okatie 230 kV #2: Construct
Filed owner code SAV · Georgia filingSAV: GOSHEN (SAV) - KRAFT 115KV LINE REBUILD
14.74 miin service 366 days apart10–25 miRejected in reviewhistoricalrank 1

Pair DESC:06367 D - G__GPC:20785. A rejected pair retained for audit. It is not a validated coordination opportunity.

Coordination card

Impact inputs →

Deterministic facts

Gemini brief

Brief unavailable: no validated Gemini brief could be loaded for this pair. The deterministic evidence remains available.

Evidence

A

Jasper – Okatie 230 kV #2: Construct

Dominion Energy SCDESC:06367 D - G
Source
DESC filing 2025-2029, p. 18
Native ID
06367 D - G
Owner code
Not published
In service
5/31/2026 (exact date 2026-05-31)
Status
In Progress

Endpoint locations

  • Jaspermedium confidence
    32.36070, -81.12415 · OpenStreetMap way/185380597
    Medium by location-review-v2: exact normalized-name match to way/185380597; state evidence home_state_only; operator evidence missing; voltage evidence match; coordinate method overpass_bbox_center; limitations project_area_unverified, operator_missing.
1 rejected or unlocated candidate
  • Okatie Unlocated by location-review-v2: no_named_osm_candidate.

Center: 32.36070, -81.12415, from one located endpoint

Values as filed

Project name
Jasper – Okatie 230 kV #2: Construct
DESC filing 2025-2029, p. 18Jasper – Okatie 230 kV #2: Construct
Project ID
06367 D - G
DESC filing 2025-2029, p. 1806367 D - G
Description
Construct a 230 kV line with B1272 ACSR from Jasper to Okatie 230/115kV Substation. The line is estimated to be 6.5 miles long. This makes Jasper a Medium Impact substation and will require a new CIP Hut.
DESC filing 2025-2029, p. 18Construct a 230 kV line with B1272 ACSR from Jasper to Okatie 230/115kV Substation. The line is estimated to be 6.5 miles long. This makes Jasper a Medium Impact substation and will require a new CIP Hut.
Need
This project is needed to improve system performance and to meet NERC TPL and internal DESC Planning Criteria for reliability.
DESC filing 2025-2029, p. 18This project is needed to improve system performance and to meet NERC TPL and internal DESC Planning Criteria for reliability.
Status
In Progress
DESC filing 2025-2029, p. 18In Progress
In-service date
5/31/2026
DESC filing 2025-2029, p. 185/31/2026
Estimated cost (as filed)
$28,578,734
DESC filing 2025-2029, p. 18Previous 2025 2026 2027 2028 2029 Total* $14,451,420 $11,867,669 $2,259,645 $0 $0 $0 $28,578,734
Voltage
230 kV
DESC filing 2025-2029, p. 18Jasper – Okatie 230 kV #2: Construct
Endpoints (as filed)
Jasper · Okatie
DESC filing 2025-2029, p. 18Jasper – Okatie 230 kV #2: Construct

Filing changes

Raw source text
Project 18 of 47
Dominion Energy South Carolina
Planned Transmission Projects $2M and above Total
5 Year Budget
Jasper – Okatie 230 kV #2: Construct
Project ID
06367 D - G
Project Description
Construct a 230 kV line with B1272 ACSR from Jasper to Okatie 230/115kV Substation. The line is
estimated to be 6.5 miles long. This makes Jasper a Medium Impact substation and will require a new
CIP Hut.
Project Need
This project is needed to improve system performance and to meet NERC TPL and internal DESC
Planning Criteria for reliability.
Project Status
In Progress
Planned In-Service Date
5/31/2026
Estimated Project Cost
Previous 2025 2026 2027 2028 2029 Total*
$14,451,420 $11,867,669 $2,259,645 $0 $0 $0 $28,578,734
*Total Estimated Amount applied to 2026 Rate Base Calculation
B

SAV: GOSHEN (SAV) - KRAFT 115KV LINE REBUILD

Filed owner code SAV · Georgia filingGPC:20785
Source
GPC filing 2025 IRP, p. 183 (page number only; decision D2)
Native ID
20785
Owner code
SAV · utility from owner:SAV
In service
6/1/2027 (exact date 2027-06-01)

Endpoint locations

  • KRAFTmedium confidence
    32.14814, -81.14598 · OpenStreetMap way/121986375
    Medium by location-review-v2: exact normalized-name match to way/121986375; state evidence home_state_only; operator evidence match; voltage evidence match; coordinate method overpass_bbox_center; limitations project_area_unverified.
1 rejected or unlocated candidate
  • GOSHEN Unlocated by location-review-v2: multiple_contextually_viable_candidates.

Center: 32.14814, -81.14598, from one located endpoint

Values as filed

Project name
SAV: GOSHEN (SAV) - KRAFT 115KV LINE REBUILD
GPC filing 2025 IRP, p. 183SAV: GOSHEN (SAV) - KRAFT 115KV LINE REBUILD
Project ID
20785
GPC filing 2025 IRP, p. 18320785
In-service date
6/1/2027
GPC filing 2025 IRP, p. 1836/1/2027

Filing changes

No changes recorded between filings.